Home ProductsConveyor Belt Vulcanizing Tools

Automatic Vulcanizing Press Machine Control Box Small Size Easy Operation

Automatic Vulcanizing Press Machine Control Box Small Size Easy Operation

    • Automatic Vulcanizing Press Machine Control Box Small Size Easy Operation
  • Automatic Vulcanizing Press Machine Control Box Small Size Easy Operation

    Product Details:

    Place of Origin: CHINA
    Brand Name: Tongxin
    Certification: IS0
    Model Number: Non-standard

    Payment & Shipping Terms:

    Minimum Order Quantity: 1 Unit/Units
    Price: Negotiable
    Packaging Details: Standard Packing
    Delivery Time: 15-30days
    Payment Terms: T/T,L/C,Western Union,Paypal and MoneyGram
    Contact Now
    Detailed Product Description
    Temperature Range: 0-300 Voltage: AC380
    Current: 12.6-46A Power: 5.5-20KW
    High Light:

    vulcanizing tools and equipments

    ,

    conveyor belt repair tools

    Water-cooling vulcanizing machine (hereinafter referred to as vulcanizing machine)

    1. Primary power supply 11, lower plate heating indication 2, fuse tube 12, vulcanization end indication 3, lower plate current indication 13, primary power indication 4, upper plate current indication 14, air leakage automatic switch 5, upper plate control switch 15. Time meter 6, upper plate temperature meter 16, manual/automatic switch 7, lower plate temperature meter 17, vulcanization time switch 8, lower plate control switch 18, lower plate power supply 9, voltage indication 19, upper plate power supply 10, Upper plate heating indication 20, grounding screw

    13.jpg2, dial 6,7 upper finger set the vulcanization temperature (145 ° C) adjustment 15 set vulcanization holding time; 17 placed (OFF) position; turn on the power, 13 bright. Close the 14 and 10 reading indications; rotate 5, 8, 10, 11 respectively, respectively, 6, 7 green light is on. Use the test pump to inject water into the water pressure plate to set the water pressure. When the temperature reaches the set value, 10, 11 lights off, 6, 7 green light is off, red light is on, when the 6 and 7 red lights are all on, put 17 in the "ON" position. (At this point, the temperature is constant until the end of vulcanization) 15 preset time, the secondary power supply is automatically disconnected, 12 bright, and the vulcanization is over. If a meter is damaged during the vulcanization process, it can be rotated 6 to the manual position, and all instruments have no effect. The hot plate temperature can be read from the mercury thermometer, and can be controlled by 5, 8 to maintain the constant temperature, thereby completing the vulcanization work. In the manual position, the leakage protection does not work and the total grounding wire must be reliable and secure.

    Maintenance and maintenance of vulcanizer:

    1. Before use, check the insulation resistance of the hot plate. If it is too low, it should be energized and dried until the insulation value reaches 50MΩ or less.

    2, in the use of moving in the process should be handled with care, civilized operation;

    3. If you work in the field, you should have reliable rain and waterproof means to avoid being affected by rain and moisture.

    4. When the use of its length is completed, it should be placed in the warehouse where the air circulation, relative humidity is not more than 85%, and is not affected by rain. The sleeper is raised below, and it is strictly prohibited to be placed on the ground.

    Contact Details
    Jiangyin Tongxin Vulcanizing Machine Manufacturing Co., Ltd.

    Contact Person: Cai

    Send your inquiry directly to us (0 / 3000)

    Contact

    Address: No. 21, Hetang Central Street, Jiangyin City, Jiangsu Province

    Factory Address:No. 21, Hetang Central Street, Jiangyin City, Jiangsu Province