Place of Origin: | CHINA |
Brand Name: | Tongxin |
Certification: | IS0 |
Model Number: | Non-standard |
Minimum Order Quantity: | 1 Unit/Units |
---|---|
Price: | Negotiable |
Packaging Details: | Standard Packing |
Delivery Time: | 15-30days |
Payment Terms: | T/T,L/C,Western Union,Paypal and MoneyGram |
The Working Medium Of The Pump: | 5 ~ 60 C Clean Water | Driving Method: | Manual |
---|---|---|---|
Use: | Test Pump | Model: | S-SY12.54 |
High Light: | vulcanizing tools and equipments,conveyor belt repair tools |
S-SY12.54 type manual hydraulic pump instructions
The S-SY 12.54 manual hydraulic pump is used for the pressurization of the vulcanizer. It has the advantages of small size, light weight, simple structure, beautiful appearance, convenient use and maintenance, etc. It is an ideal portable manual hydraulic pump
The working medium of the pump is clean water with a temperature of 5 ~ 60 °C
The pump is a vertical single-cylinder manual reciprocating pump, which is composed of main components such as water tank, cylinder block, plunger, inlet valve group, pressure gauge, handle drain valve and working nozzle. During operation, the handle moves the plunger up and down. When the
plunger rises, the inlet valve opens, the working medium is drawn into the cylinder. When the plunger is depressed, the inlet valve opens and the working
medium is drawn into the cylinder. When pressed, the inlet valve closes, the outlet valve opens, and the medium is pressurized and discharged from the side. When the pressure rises to the required working pressure, the pump is kept under pressure, the pressure gauge indication value is the working
pressure, the pressure holding is over, the drain valve is opened, and the working medium is returned to the water tank to relieve pressure
Install the pressure gauge first. (The seal between the table and the pipe joint is the 0-ring seal l Ox 19GB 1235-86 handle and the work joint (high pressure joint and quick joint assembly). The water tank is filled with the medium and then starts working
During use, please add a few drops of oil to the plunger and pin at regular intervals to lubricate. If leakage is found, it should be repaired first. If
tightening the threaded joints, adjust the pressure nut of the plunger seal. If it is found that the pressure holding performance is poor or the boosting speed is too slow, it is mainly necessary to check whether the drain valve is closed, and then check whether the inlet valve leaks. If necessary, remove the cleaning, repair or replace the grinding
When the pump is inactive for a long time, it should drain the inner cavity and drain the anti-rust oil or oil for anti-corrosion treatment.
Contact Person: Cai
Address: No. 21, Hetang Central Street, Jiangyin City, Jiangsu Province
Factory Address:No. 21, Hetang Central Street, Jiangyin City, Jiangsu Province