Home ProductsConveyor Belt Vulcanizing Machine

Horizontal Conveyor Belt Vulcanizing Machine Rubber Vulcanizing Equipment

Horizontal Conveyor Belt Vulcanizing Machine Rubber Vulcanizing Equipment

    • Horizontal Conveyor Belt Vulcanizing Machine Rubber Vulcanizing Equipment
  • Horizontal Conveyor Belt Vulcanizing Machine Rubber Vulcanizing Equipment

    Product Details:

    Brand Name: Tongxin
    Certification: IS0

    Payment & Shipping Terms:

    Minimum Order Quantity: 1 Unit/Units
    Price: Negotiable
    Packaging Details: Standard Packing
    Delivery Time: 15-30days
    Payment Terms: T/T,L/C,Western Union,Paypal and MoneyGram
    Contact Now
    Detailed Product Description
    Temperature: 0-200℃ Our Techincial: Own Professional Design
    Power(W): According To Model And Size Usage: Belt Joint
    High Light:

    belt vulcanizing equipment

    ,

    rubber vulcanizing press machine

    Special equipment for vulcanization bonding of conveying machine

    Electric heating tape vulcanizing machine is a special equipment for vulcanizing and bonding of mechanical tape joints. This machine is made of lightweight aluminum alloy material, small size, light weight, ordinary three-phase power supply, uniform hot plate temperature, uniform pressure provided by hydraulic system (1.0 ~ 2.0mpa), and equipped with light automatic liquid crystal digital display Temperature control box, the connection between the temperature control box and the host is completed by the integrated plug-in and multi-core cable, which is easy to operate and reliable. At the same time, it has the characteristics of fast heating, uniform temperature and high thermal efficiency. It is an ideal bonding equipment for conveying mechanical rubber belt joints.
    The quality of the tape joint directly affects the working efficiency and service life of the tape, especially the current long-distance and high-strength conveyor belts are more important. Therefore, the SD-type series electric heating tape vulcanizers of the "Shandong Weiye" brand are the current tape transportation machinery. Indispensable auxiliary equipment.

     

    This product is widely used, and it can be applied to the transportation joints of on-site glued conveyors in metallurgy, chemical industry, metal mines, power plants, ports, docks, etc. The technical parameters provided by this machine and the correct implementation of the relay strength of vulcanized tape are more than 90%, not only the joint is smooth, almost the same as the original belt, but also can reduce the wear on the roller and extend the service life of the conveyor and rubber conveyor

     

    Features and advantages:
    1. Our factory's vulcanizing machine and repairing machine adopt a unique process and unique technology of full-automatic precision digital display control system. The whole machine is light and 1/3 lighter than the original. Reliable and durable. Exceeds the advanced level of domestic and foreign counterparts.
    Second, the upper and lower heating plates
    Purchase high-quality aluminum alloy materials, select Alcoa 7075 high-strength aviation aluminum plate, refined by special process, its characteristics:
    1. Small size, light weight reduced by half, low energy consumption, fast temperature rise, the entire board surface is quite flexible after heating, and it is closer to the tape than the conventional machine. Under 1.5mpa pressure, its parallel tightness is not greater than 0.03mm Generally conventional machines do not have this capability.
    2. The heating at each point of the upper and lower heating plates is uniform. After entering the heat preservation stage for 10 minutes, the temperature difference between the points on the working surface is only ± 3 ℃ ~ 4 ℃, which exceeds the international standard.
    3. The time from the normal temperature to the vulcanization temperature (145 ℃) is less than 25min, the power is half lower than the same industry at home and abroad, and the energy saving effect is good.
    4. The vulcanized glue is repaired or repaired at one time, and the glued part is flat, smooth, and the fastness is no different from the original belt.
    5. The heating layer and the sandwich layer are trinity, with simple structure and easy installation.
    Third, water cooling:
    The heating layer is equipped with international advanced DC water cooling circulation device. Quickly cool from 145 ° C to 70 ° C, it only takes 5 minutes to speed up the bonding process, improve the strength of the belt joint and maintain the belt joint.
    Fourth, the handle:
    The handle has the characteristics of SD soft connection, it is not hot during high temperature operation, the appearance is chrome-plated, bright and beautiful, small and exquisite.
    Five, hydraulic pressure plate:
    1. The hydraulic pressure plate is refined by international advanced technology. Due to the special structure, the overall pressure is uniform, and numerous high pressure tests. The hydraulic pressure plate has passed 1.875mpa, 30min high pressure test without leakage, exceeding international standards.
    2. The water pressure plate can be used for both water pressure and air pressure.
    Six, the power line into the plug:
    The power supply line adopts a special five-core integrated flat plug, which changes the disadvantages of the conventional multi-line multi-plug, and truly simplifies the integration of the line.
    7. Fully automatic electrical control box:
    1. The electrical components of the full-automatic electric control box are selected from Japan's Panasonic Corporation. The liquid crystal digital display is an intuitive instrument with good quality and durability. Digital and indicator display, preset vulcanization time and temperature, the entire vulcanization process is fully automatic operation, the warning light is on, and the work is automatically completed.
    2. The fully-automatic LCD digital temperature control box is exquisite in appearance, compact and exquisite, and adopts an advanced vertical double-layer waterproof technology. The dust-proof and waterproof integrated cover can be adapted to work in harsh weather such as sand, rain, and hot sun.
    3. Equipped with automatic leakage switch for overload and short circuit leakage protection performance to ensure personal safety.
    4. Due to the integrated circuit, automatic operation procedures, and unified plugs and sockets, the electric control box can be used with all the vulcanizing machines and repairing machines in our factory. Conventional machines do not have this performance.
    Eight, tie rod, nut:
    The tie rods and nuts are made of high-steel material, which is light in weight, high in strength and easy to operate.

    During the production and operation process, it is subject to vibration shock and other combined forces, which causes the parts to form gaps and cause wear. Traditional repair methods include surfacing, thermal spraying, and brushing. However, several methods have certain disadvantages: surfacing will cause the surface of the part to reach a very high temperature, causing the part to deform or crack, affecting dimensional accuracy and normal use. It can also cause fracture when it is severe; although the brush crossing has no thermal influence, the thickness of the crossing layer cannot be too thick, the pollution is serious, and the application is also greatly restricted.
    Because the material is a "variable" relationship, when an external force impacts the material, the material will deform and absorb the external force, and expand and contract with the expansion or contraction of the bearing or other components, always maintaining a tight fit with the components, reducing the probability of wear. For the wear and tear of large-scale vulcanizers, "molds" or "matching parts" can also be used to repair the damaged equipment on-site, avoiding the overall disassembly of the equipment, maximizing the component size and meeting the production and operation requirements of the equipment.

     

    Operating procedures:
    1. Pay attention to the temperature of the hot plate when preheating. If it fails to meet the requirements, it must be adjusted under the guidance of the instructor.
    2. Before the experiment, check whether the required scale is reached in the fuel tank, and then turn on the machine to check whether the parts work normally and the column (frame plate) is lubricated.
    3. When placing the mold between the hot plates, prevent burns or crushing accidents. Do not put the mold into the mold when the hot plate rises.
    4. After the mold is loaded, the plate should be placed in the middle, and the person should stand in the center of the operation table. When the required pressure is reached after the mold is closed, the motor should be turned off. If it fails to meet the requirements, please ask the instructor to adjust it.
    5. Use iron hooks to prevent mold crushing. When the mold is opened, the product sticks to the mold. Be careful when knocking on the mold opening tool to prevent the mold from falling or hurting your feet.
    6. If the machine fails, you must immediately cut off the power and report it to the teacher. It is strictly forbidden to disassemble all parts without permission.

    Project/Data/Model

    Adhesive tape

    width
    (mm)

    specification

    Heating plate size

    Length × width
    (mm)

    Total power
    (kw)
    Heavy weight
    (kg)

    Dimensions

    Length × width × height
    (mm)

    total weight
    (kg)
    Configuring device
    Manual pump Electric control box

    TXCK-650

    DJSL/DGLJL-650

    650 650×830 830×820 9.8 56 1320×830×585 398 1 1
    650×1000 1000×820 11.8 66 1320×1000×585 460 1 1

    TXCK-800

    DJSL/DGLJL-800

    800 800×830 830×995 11.89 70 1450×830×585 485 1 1
    800×1000 1000×995 14.4 79 1450×1000×585 550 1 1

    TXCK-1000

    DJSL/DGLJL-1000

    1000 1000×830 830×1228 14.7 82 1700×830×585 556 1 1
    1000×1000 1000×1228 17.8 95 1700×1000×585 596 1 1

    TXCK-1200

    DJSL/DGLJL-1200

    1200 1200×830 830×1431 17.2 96 1950×830×750 784 1 1
    1200×1000 1000×1431 20.7 113 1950×1000×750 900 1 1

    TXCK-1400

    DJSL/DGLJL-1400

    1400 1400×830 830×1653 19.8 107 2150×830×900 857 1 1
    1400×1000 1000×1653 23.9 132 2150×1000×900 1080 1 1

    TXCK-1600

    DJSL/DGLJL-1600

    1600 1600×830 830×1867 22.3 120 2380×830×900 1102 1 1
    1600×1000 1000×1867 27 146 2380×1000×900 1400 1 1

    TXCK-1800

    DJSL/DGLJL-1800

    1800 1800×830 830×2079 24.9 137 2620×830×900 1247 1 1
    1800×1000 1000×2079 30.. 164 2620×1000×900 1500 1 1

    TXCK-2000

    DJSL/DGLJL-2000

    2000 2000×830 830×2303 27.6 154 2830×830×900 1385 1 1
    2000×1000 1000×2303 33.2 182 2830×1000×900 1750 1 1

    TXCK-2200

    DJSL/DGLJL-2200

    2200 2200×830 830×2478 29.7 165 2997×830×900 1446 1 1
    2200×1000 1000×2478 35.8 198 2997×1000×900 1800 1 1

    Horizontal Conveyor Belt Vulcanizing Machine Rubber Vulcanizing Equipment 0

    1.Frame

    2.clamping mechanism

    3.horn

    4.screw

    5 .nut

    6. Washer

    7. High pressure hose

    8 .Pressure test pump

    9 .heat shield

    10.upper heating plate

    11.Secondary cable

    12.Electric control box

    13.Primary cable

    14.lower heating plate

    15.Water pressure plate

     

    1. Before the installation of the combing machine, the main parts (such as electric healing plates, pressure devices, racks, etc.) are evenly separated and separated, and the vulcanizer is temporarily transported to the site for temporary installation.

    2. each separate separation of the parts, is also a frequent moving parts. Generolly, the heaviest parts can be handled by two people, so it is convenient to install and disassemble.

    3. Before installation, find a more spacious place on the installation of the tape conveyor. In this place, not only the indefinite operating area and space, but also the placement of the tape and the power wiring are convenient.

    4.Before installation, on the belt conveyor installation line, disassemble the upper rollers and set up a working platform in the form shown in Figure 2. If it is glued in the field, use a canvas to build a temporary rainproof shed around the work platform

    5.Install the tools of the vulcanizing machine, the tools for processing the tape joints, the power supply wires, etc., and confirm that the glued village materials (such as cover rubber, core glue and glue) are within the validity period, the manufacturer and the production date.

     

    Horizontal Conveyor Belt Vulcanizing Machine Rubber Vulcanizing Equipment 1

    6. Installation of the vulcanizer is carried out as follows:

    (1) Place the single lower machine in the form shown in Figure 3;

    (2) As shown in Figure 4, first place the pressure device (water pressure plate) on the placed lower frame machine; then place the lower electric plate on it. After the three are aligned, the lower electric heating plate is covered with plastic film (or talcum powder); Note: When multiple vulcanizers work in parallel, a thin metal plate with a 0.2x50x seam length is placed at the joint of the lower electric plate.

    (3) Place the tape joints that have been processed and processed well and filled with the rubber material on the lower hot plate; after finding the center line, fix the tape on both sides with the clamp plate and the clamping mechanism. Its form is shown in Figure 5;

    (4) on the tape joint. Place the plastic film (or talcum powder) in the position corresponding to the lower hot plate, and then place the electric heating plate and the heat insulation board on it in order. Its form is shown in Figure 6.

    Note: When multiple vulcanizers work in parallel, a thin metal plate with a 0.2x50x seam length is placed at the joint of the lower electric plate

    Horizontal Conveyor Belt Vulcanizing Machine Rubber Vulcanizing Equipment 2

    (5) Place the upper frame on the heat insulation board as shown in Figure 7, and align and align with the lower frame.

    (6) According to Figure 8, install the pre-tightening bolts, washers and nuts in the elongated holes at the upper and lower frames, and tighten the nuts with a wrench. At this point, the main part of the vulcanizer is installed.

    (7) According to Fig. 9, the quick joint of the pressure pump system is connected with the water inlet hole of the pressure device, and the primary power supply wire is correspondingly inserted into the socket of the electric heating control box, and one end of the secondary wire is inserted in the electric heating control box. On the socket, the other end is inserted on the hot plate; the corresponding one of the thermal resistance (or thermocouple) wire is inserted into the socket of the electric heating control box, and the other end is inserted into the temperature measuring hole of the electric heating plate. At this time, the vulcanization mounting is completed, and the timing operation of pressurization and heating is prepared.

    Maintenance and maintenance

    1. Before use. check the insulation resistance of the hot plate. If it is too low, it should be energized and dried until the insulation value reaches 50MΩ or less.

    2. in the use of moving in the process should be handled with care. civilized operation;

    3.If you work in the field, you should have reliable rain and water proof means to avoid being affected by rain and moisture.

    4.When the use of its length is completed. it should be placed in the warehouse where the air circulation, relative humidity is not more than 85%. and is not affected by rain. The sleeper is raised below, and it is strictly prohibited to be placed on the ground

     

    Contact Details
    Jiangyin Tongxin Vulcanizing Machine Manufacturing Co., Ltd.

    Contact Person: Cai

    Send your inquiry directly to us (0 / 3000)

    Contact

    Address: No. 21, Hetang Central Street, Jiangyin City, Jiangsu Province

    Factory Address:No. 21, Hetang Central Street, Jiangyin City, Jiangsu Province